Thermal Power Plant Chlorination

  • Client
  • Project
  • System
  • Commissioned
  • M/s.Bechtel International Inc.
  • Enron Power Project.
  • 1000 kgs/hr Chlorine Leak Neutralization System.
  • 1998
  • Andhra Pradesh State Electricity Board
  • Kothagudum TPS-V
  • 3 x 120 kg/hr Chlorination System (Consultant : Desein Ltd. )
  • May 2000
  • Neyveli Lignite Corporation Ltd.
  • Thermal Power Station Expansion I
  • 3x100 kg/hr Chlorination, Leak Absorption and Chemical Dosing System (Consultant : MECON)
  • 2002
  • M/s. BSES Kerala Power Ltd.
  • Kochi, Kerala
  • 2 x 15 kgs/hr CW Chlorination System.(Consultant : Fichtner Consulting Engineers (India) Pvt. Ltd.)
  • 1999
  • Andhra Pradesh State Electricity
  • Rayalseema T.P.S.
  • 2 x 10 kg/hr Chlorination System.(Consultant : Desein Ltd)
  • 1995
  • Punjab State Electricity Board
  • Guru Nanakdev T.P.S
  • 2 x 5 kgs/hr Chlorination System (Consultant : Tata Consulting Engineer )
  • 1997
  • Rajasthan Atomic Power Project.
  • Rajasthan
  • 2 x 2 kg/hr Chlorination System
  • 1997
  • M/s Envirad Projects Pvt. Ltd.
  • NTPC Badarpur BTPS
  • 1x1 kg/hr Vacuum Chlorinator
  • 1998
  • Rajastan State Electricty Board
  • Suratgarh T.P.S.
  • 2 x 750 gms/hr & 2 x 75 gms/hr Chlorination System.(Consultant : Development Consultant.)
  • 1998
  • M/s National Thermal Power Corp.
  • Vidyut Nagar, U.P.
  • Valves & Chlorination system accessories
  • 1997 to 99
  • M/s National Thermal Power Corp.
  • NTPC Auryia Gas Power Project
  • Valves & Chlorination system accessories
  • 1996
  • M/s Bechtel International Inc.
  • Enron Power Project Dabhol - Phase II (Repeat Order)
  • Chlorine Leak Absorption System
  • 2000
  • BSES Ltd. 230 MW Combined Cycle Power Project
  • Samalkot, Andhra Pradesh
  • 2x60 kg/hr. CW Chlorination System with Leak Absorption System
  • 2003
  • APGENCO
  • Project-Kothagudam, A.P
  • 2x50 kg/hr. CW Chlorination System with Leak Absorption System
  • 2003